In 2024, our marine wired digital signal acquisition system successfully completed a groundbreaking 360 km² 3D seismic survey in the Bunyu offshore area of North Ketapang.

3D Marine North Ketapang
Prime duration: 22 days!
Infill: 6.4%
Thanks to steerable streamer MARIGEO and favorable current.
Demobilization Summary

Our Footprints
Our marine wired digital signal acquisition system successfully completed a groundbreaking 360 km² 3D seismic survey in the Bunyu offshore area of North Ketapang.


Our Boat

3D Marine & Duration
- 360 Square Kilometers
- 2 chase and 1 small supply boat
- Surrounded by 7,500+ rumpon
- As close as 1km from shore
- Prime duration: 22 days!
- Infill: 6.4% thanks to steerable streamer MARIGEO and favorable current.
- Standby: 23hrs. compensating the change in survey plan.
- Tech. downtime: 16 hrs. on compressor settings.Collaborate with fellow architects.